Logistics FAQ
These are straightforward answers to the questions we hear most from shippers. They’re written for operations, logistics, and supply chain teams who need clear explanations, not buzzwords.
What’s the difference between FTL and LTL?
FTL (Full Truckload) means your freight uses the whole trailer. LTL (Less Than Truckload) means your freight shares space with other shippers.
FTL is usually the right fit when:
- You have enough volume to fill most of a trailer
- Timing is tight and you want fewer touches
- The freight is sensitive or high-value and you want it handled once
LTL is usually the right fit when:
- You’re shipping a few pallets at a time
- You want to control cost on smaller, regular shipments
- You can accept a bit more handling and slightly longer transit
Clancy runs both FTL and LTL and can recommend the right mix based on your lanes, volume, and risk tolerance.
What is drayage?
Drayage is the short-haul movement of containers between ports, rail ramps, warehouses, and nearby facilities. It’s the link between ocean/rail and over-the-road trucking.
Clancy handles:
- Port and rail-ramp drayage for import and export containers
- Container moves to and from Tri-State warehouses and plants
- Coordination of appointments at DCs, plants, and cross-docks
- Monitoring of free time, storage, and demurrage exposure
What is transloading?
Transloading is moving freight from one mode or piece of equipment to another—for example, from an ocean container into a dry van, refrigerated trailer, or flatbed.
Clancy uses its Tri-State facilities as transload hubs to:
- Strip containers and rework freight
- Palletize, re-label, and prepare outbound orders
- Reload into dry vans, refrigerated trailers, or flatbeds
- Stage freight for regional and national distribution
How do I ship oversized machinery?
Oversized machinery usually needs special equipment, permits, and planning. It’s not just ‘put it on a truck.’
Clancy combines:
- Flatbed, stepdeck, double-drop, and extendable trailers
- Route surveys and site access planning
- Oversize and overweight permits across multiple states
- Pilot cars and escort coordination where required
- Coordination with cranes, rigging crews, and installation teams
The best first step is to share:
- Dimensions and weight of each piece
- Origin and destination (or project sites)
- Site constraints (dock access, ceiling height, door sizes, yard space)
From there, we can design a route and on-site plan that fits your outage or changeover window.

What questions should I ask before hiring a logistics provider?
Good questions to ask include:
- Do you own and operate your own equipment and facilities, or do you broker everything out?
- Who is my day-to-day contact when something goes wrong?
- How do you handle high-value, sensitive, or time-critical freight?
- Can you support both transportation and warehousing, or will I be managing multiple providers?
- What does communication look like during a complex move or project?
Clancy’s answer is that we own and operate transportation, warehousing, and specialized logistics under one relationship, with coordinators who stay close to the work instead of handing you off.